EPC CONTRACTOR

Contractor

  • Construction of foundation for MW class turbines having own construction equipments. Batching plant of size ranging 20CM/HR to 60 CM/HR. Transit mixer, Concrete Boom Placer & other related infrastructure
  • Supply, Erection & Commissioning of GSS (Grid Substation) up to 66 KV for utilities & windfarm developer
  • Transmission line up to 66KV level for windfarm & solar developer
  • Installation of MW wind turbines with tools & equipment
  • Supply, Erection & commissioning for WTG unit substation, 33KV Transformer D. P. Yard and 33KV transmission network

Construction of road, culvert & crane pad for MW class wind turbines